AKM Consulting Engineers conducted a Level 2 condition assessment and feasibility study for the 1348 Zone 3 and 4 pump station, built in 1959 and upgraded in 2004. The pump station had two horizontal centrifugal pumps and electrical service from a 150 kVA transformer. The building structure was in fair condition but did not meet existing codes. Past efficiency tests showed the motor for pump 3 was undersized. AKM identified several deficiencies and suggested mitigation in case the City decided to retain its existing setup:
Given the pump station’s age and the cost of upgrades, AKM recommended constructing a new pump station and demolishing the existing one.